Notice: 21954221
Notice of Development of Rulemaking
Department: PUBLIC SERVICE COMMISSION
Chapter: ELECTRIC SERVICE BY ELECTRIC PUBLIC UTILITIES

VIEW NOTICE

Overview


RULE:
25-6.0143   Use of Accumulated Provision Accounts 228.1, 228.2, and 228.4
25-6.030   Storm Protection Plan
25-6.031   Storm Protection Plan Cost Recovery Clause
25-6.034   Standard of Construction
25-6.0341   Location of the Utility’s Electric Distribution Facilities
25-6.0342   Electric Infrastructure Storm Hardening (Repealed)
25-6.0343   Municipal Electric Utility and Rural Electric Cooperative Reporting Requirements
25-6.0345   Safety Standards for Construction of New Transmission and Distribution Facilities
25-6.044   Continuity of Service
25-6.0455   Annual Distribution Service Reliability Report
25-6.061   Relocation of Poles
25-6.064   Extension of Facilities; Contribution in Aid of Construction
25-6.077   Installation of Underground Distribution Systems Within New Subdivisions
25-6.078   Schedule of Charges
25-6.081   Construction Practices (Repealed)
25-6.115   Facility Charges for Conversion of Existing Overhead Investor-owned Distribution Facilities
RULEMAKING AUTHORITY: 350.127(2), 366.05(1), 366.96, FS
LAW: 350.115, 366.03, 366.04(1), (2), (4)–(6), 366.041(1), (4), 366.05(1), (7), 366.06(1), 366.96, FS
PRINT PUBLISH DATE: 6/7/2019   Vol. 45/111

RELATED STATUTES
AND LAWS:
350.127(2), 366.05(1), 366.96, FS, 350.115, 366.03, 366.04(1), (2), (4)–(6), 366.041(1), (4), 366.05(1), (7), 366.06(1), 366.96, FS

OVERSIGHT COMMITTEE: Joint Administrative Procedures Committee
Florida Administrative Law Central Online Network (F.A.L.C.O.N.)

RELATED COURT CASES: Division of Administrative Hearings

FEDERAL eRULEMAKING
WEB PORTAL:
Regulations.gov

HOW TO LINK TO
THIS NOTICE:
http://www.flrules.org/gateway/ruleno.asp?id=25-6.0143&PDate=6/7/2019&Section=1
REFERENCE MATERIALS: No reference(s).