Rule: 62-304.735 Prev   Up   Next

Rule Title: Everglades Basin TMDLs
Department: DEPARTMENT OF ENVIRONMENTAL PROTECTION    Add to MyFLRules Favorites
Add to MyFLRules Favorites
Division: Departmental
Chapter: TOTAL MAXIMUM DAILY LOADS

Latest version of the final adopted rule presented in Florida Administrative Code (FAC):

VIEW_RULE Effective Date: 7/30/2013
History Notes: Rulemaking Authority 403.061, 403.067 FS. Law Implemented 403.061, 403.062, 403.067 FS. History–New 7-30-13.
References in this version: No reference(s).
History of this Rule since Jan. 6, 2006
Notice /
Adopted
Section Description ID Publish
Date
View Text Development
62-304.100
......
The Department is initiating rulemaking to establish Total Maximum Daily Loads (TMDLs) for certain Florida surface waters, where those waters previously have been identified as impaired for specific pollutants and included .... 21669138 3/29/2019
Vol. 45/62
View Text Final
62-304.735
Everglades Basin TMDLs 13261178 Effective:
07/30/2013
View Text Proposed
62-304.735
The purpose of the rule is to adopt a Total Maximum Daily Load (TMDL), and its allocation, for fecal coliform the West Palm Beach Canal within the Everglades Basin. 12999666 5/14/2013
Vol. 39/94
View Text Workshop
62-304.735
To receive public comments on a draft total maximum daily load (TMDL) for an impaired water segment in the Everglades basin, to be adopted in ....
  Friday, August 17, 2012, 2:30 p.m.
  Florida Department of Environmental Protection, Southeast District ....
11822959 8/3/2012
Vol. 38/31
View Text Development
62-304.300
......
The Department is initiating rulemaking to establish Total Maximum Daily Loads (TMDLs) for waters in the following basins: St. Marks River, Chipola River, Pensacola Bay, Perdido Bay, Upper East Coast, Ocklawaha, Upper St. .... 10709787 11/23/2011
Vol. 37/47