FAR Issue Vol. 41/No. 173 | Section VII | |
Issue Date: September 4, 2015 | ||
Total number of notices in Section VII: 3 |
Notice / Adopted |
Description | ID | Publish Date |
|
---|---|---|---|---|
Pipelining Technologies, Inc. Petitioner seeks clarification as to whether a permit is mandatory for installing Cured in Place Pipe in drainage systems within the .... |
16439868 |
9/4/2015 Vol. 41/173 |
||
Bracken Engineering, Inc. Petitioner seeks clarification as to whether the statement in the preface exempts all of the code requirements addressing snow load .... |
16438995 |
9/4/2015 Vol. 41/173 |
||
.... .... |
16439577 |
9/4/2015 Vol. 41/173 |