NOTICE OF INVITATION TO BID
BID NO. BDC 62-08/09
The Department of Environmental Protection, Division of Recreation and Parks, Bureau of Design and Construction is soliciting formal competitive bids from General and Building contractors for the project listed below:
PROJECT NAME: Colt Creek State Park – Park Development
SCOPE OF WORK: The contractor shall provide all labor, materials, equipment and supervision to construct a park entrance drive; Ranger Station with septic field and employee parking area; one (1) Large (18 Table) Picnic Pavilion with Restrooms, septic field, and Visitor Parking Lot; two (2) Small (6 Tables) Picnic Pavilions; a paved 1.20 mile perimeter lakeside bike/pedestrian trail; a floating fishing T-dock; and an initial phase entrance 1.78 mile roadway with multiple culvert locations (fill for the roadway is available on-site).
PROJECT BUDGET: $1,700,000.00
PARK LOCATION: Colt Creek State Park, 16000 State Road 471, Lakeland, Florida. The project is located entirely in Polk County within Sections 18, 19, and 20 of Township 25S, Range 23E. It is located on the east side of SR 471, north of the intersection of US 98N and SR 471.
PROJECT MANAGER: Steven Gertel, Bureau of Design and Construction, Alfred B. Maclay Gardens State Park, 3540 Thomasville Road, Tallahassee, Florida 32309, Telephone Number: (850)488-5372, ext. 109, Fax Number: (850)488-3537.
MINORITY BUSINESS REQUIREMENT: The Department of Environmental Protection supports diversity in its Procurement Program and requests that all sub-contracting opportunities afforded by this bid embrace diversity enthusiastically. The award of sub-contracts should reflect the full diversity of the citizens of the State of Florida. The Department will be glad to furnish a list of Minority Owned Firms that could be offered sub-contracting opportunities.
PREQUALIFICATION: When the total Bid including Alternates exceeds $200,000, each Bidder whose field is governed by Chapter 399, 455, 489, or 633, Florida Statutes, for licensure or certification, must submit the following prequalification data of their eligibility to submit bids 240 hours (10 days) PRIOR TO the Bid Opening date, unless the Bidder has been previously qualified by the Department of Environmental Protection for the current biennium (July 1 – June 30) of odd numbered years in accordance with subsection 60D-5.004(2), F.A.C., as evidenced by a letter from DEP to the Bidder, which letter shall be presented to DEP upon request. If the Department requires clarification or additional information, Bidder shall submit such information by 120 hours (5 days) prior to Bid Opening. Material submitted after those deadlines shall disqualify the Bidder.
INSTRUCTIONS: Any firm desiring plans and bid specifications for this project may obtain a copy by writing the address or calling the telephone number below. Compact Disk (CD) containing the plans and specifications will be available on December 12, 2008 at Colt Creek State Park, 16000 State Road 471, Lakeland, Florida 33809. Attention: Scott Spaulding, Park Manager, Cellular Telephone: (863)661-8196, Office (863)815-6761, Fax (863)815-6759.
ADA REQUIREMENTS: Any person with a qualified disability shall not be denied equal access and effective communication regarding any bid/proposal documents or the attendance at any related meeting or bid/proposal opening. If accommodations are needed because of disability, please contact: Michael Renard, Bureau of Design and Construction, (850)488-5372, at least five (5) workdays prior to openings. If you are hearing or speech impaired, please contact the Florida Relay Services by calling 1(800)955-8771 (TDD) or 1(800)955-8770 (Voice).
BID SUBMITTAL DUE DATE: No later than 3:30 p.m. (ET), Tuesday, January 13, 2009, to the below address: Florida Department of Environmental Protection, Bureau of Design and Construction, 3540 Thomasville Road, Tallahassee, Florida 32309, Attention: Michael Renard, Construction Projects Administrator, Bureau of Design and Construction, (850)488-5372. The Department reserves the right to reject any or all bids.
BID POSTING DATE: No later than 2:00 p.m. (ET), Friday, January 16, 2009, unless extended by the Department for good cause.
NOTICE OF RIGHTS: Notice of Intent to Protest the Bid Specifications must be filed with (received by) the Agency Clerk, Lea Crandall, Department of Environmental Protection, Office of General Counsel, MS 35, 3900 Commonwealth Blvd., Tallahassee, FL 32399-3000, (850)245-2242, Fax (850)245-2303, Lea.Crandall@dep.state.fl.us during the 72-hour period after Bid Specifications are posted on the Vendor Bid System. Failure to file a Notice of Intent to Protest or a formal, written Protest in accordance with Chapter 28-110, F.A.C., within ten days after the 72-hour period ends, as prescribed in Section 120.57(3), Florida Statutes, shall constitute a waiver of your right to an administrative hearing on the Bid Specifications under Chapter 120, Florida Statutes. Rules for bid protests can be found in Sections 120.569 and 120.57, F.S., and Chapter 28-110, Florida Administrative Code. A bid protester shall comply with these statutes and rules.