Reference: Ref-12083

Reference Name: SBEACH Report 1
Agency: 62 Department of Environmental Protection
62B Beaches and Coastal Systems

Modified Document(s): No Modified document(s).
Adopted Document(s):
7/7/2020 By U.S. Army Corps of Engineers dated July 1, 1989. 2 Parts
Proposed Document(s):
7/2/2020 By U.S. Army Corps of Engineers dated July 1, 1989. 2 Parts
Description: By U.S. Army Corps of Engineers dated July 1, 1989. 2 Parts

Disclaimer: External links within the reference material are subject to change outside of the rulemaking process.

Rules/Notices using this Reference Material
Notice /
Adopted
Section Description ID Publish
Date
View Text Proposed
62B-33.002
......
The Department is proposing updates to the Rules and Procedures for Coastal Construction and Excavation (Permits for Construction Seaward of the Coastal Construction Control Line and Fifty-foot Setback) to add clarity consistent .... 30754546 4/9/2026
Vol. 52/69
View Text Final
62B-33.002
Definitions 23425517 Effective:
07/29/2020